Precautions for the determination of the duration

The items to be noted during the construction period include:
1. Reasonably arrange the comprehensive construction of civil works and installation, clarify the requirements for civil engineering installation and the construction project to provide construction conditions for the equipment construction project.
2. Depending on local conditions, do what you can.
3. Equipped with the required resources.
4. Consider the cooperation of external conditions, including the construction drawings required for construction, water, electricity, gas, roads and the engineering equipment provided by the owner, the arrival of materials, weather conditions, and attention to winter and rain periods.