Cooper Tire invests more than US$100 million in capital plant in China

Cooper Tire & Rubber announced on the 3rd that its stake in its subsidiary Coobo Big Tire (Kunshan) Co., Ltd. will increase from 50% to 100%. The increase in shareholding investment amounted to US$116.5 million, and it is expected to be completed through a wholly-owned subsidiary on March 15, 2011.

The subsidiary's finances have been incorporated into Cooper Tire & Rubber's global financial statements. After the completion of the self-delivery, the subsidiary will be renamed to Cooper Tire (Kunshan) Co., Ltd. with the approval of the government. The subsidiary currently produces a wide range of passenger car and light truck tires sold in North America and Europe and will also be sold to the Chinese domestic market in the future.

Pre-insulated Pipe Fabrication

Pre-insulated, pre-fabricated jacketed piping system is used for industrial and commercial applications. Pre-Insulated, pre-jacketed thermal pipe has a definite advantage over field installed insulation and jacketing. All straight sections of the factory preinsulated piping system shall be jacketed with a High Density Polyethylene (HDPE) jacket conforming to ASTM D1248,PVC jackets shall not be allowed.

All field butt joints shall be made in straight sections of pipe.here for welding polyethylene, it can use field hdpe pipe Butt Fusion Machines according to pipe range. For PE Pre-insulated pipe fabrication, It will use workshop fitting machines for bend fabrication of plastics. How it works? Firstly you need to prepare pe pipe Angle Cutting Saw and fix thin pipe on sepcial clamp, and then cut hdpe pre-insulated pipe in required angle. Then move this pipe and fix them on elbow clamps of pre-insulated fitting welding equipment. Special half heating plates positioned on top of the welding zone are used to ensure the required welding temperature, The appication of uniform welding pressure which is controlled hydraulically, ensures the quality of the weld between the sleeve and the pipe casing. The welding phases of pipe fabrication are below: 1. Approaching and preheating 2: Heating 3.Removing the heating element 4. Reaching the welding pressure 5.Welding 6. Cooling


Pre-Insulated Pipe Fabrication,Custom Pipe Fabrication,Pipeline Fabrication,Butt Fusion Welding Machine

WUXI MEIERTE MACHINERY TECHNOLOGY CO.,LTD , https://www.wxpipefusionweldings.com

This entry was posted in on