OEM Construction Machinery Accessories with High Quality

  • Model NO.: HT-MP-068
  • Usage: Mining Excavator
  • Transmission: Hydraulic Transmission
  • Bucket Capacity: 1.0~1.5m³
  • Certification: CE, ISO9001: 2000, SGS
  • Certificate: SGS ISO9001
  • Period of Production: 25-35days
  • Trademark: OEM
  • Specification: customed
  • HS Code: 84139000
  • Type: Excavator
  • Bucket: Backhoe
  • Drive Type: Internal Combustion Drive
  • Size: Large-Scale
  • Condition: New
  • Services: NDT Inspection
  • Processing: Forged/Forging
  • Transport Package: Non-Wooden Box/Pallet
  • Origin: China
> Our products:
Category Construction Machinery Parts, Excavator Parts
Application Travel Device and Swing Device
Material Steel, Cast Iron
Processing Forging, Casting

> Our advantages:
Supply manganese parts for all kinds of crusher models from different brands according to customer's drawings or samples
Castings - serving the industrial markets of the world
Up to 3,0000 metric tons of mechanical products annually
99% accurate quotations
Standards: ASTM, JIS, DIN, BS, GB, EN, GOST

> Inspection Equipment list:
No. Items Equipment
1 Material Spectrometer
2 C-S analyzer
3 Multi element analyzer
4 Mechanical Property Tension tester
5 Impact tester
6 Hardness tester (Brinell,Rockwell,Leeb)
7 Thickness Hardness meter, coating hardness meter
8 Dimension Three-coordinate measurement machine
9 Metallographic Structure Metalloscope
10 UT Magnetic particle detector
11 Ultrasonic flaw detector

> Our Terms of Payment:
Sample production
A down payment for half of cost of mould cost and 100% sample cost are required with the order placement. The balance is due at the time of first article approval, or within 30 days after the first article delivery at the buyer's premise, whichever is earlier.

Batch production
Option#1 - 30% down-payment with the order placement. The balance 70% is paid prior to shipping in China.

Option#2 - The buyer should establish letter of credits (L/C's) at the time of production order placement,
satisfactory to the seller, as the means of payment. The L/C should be irrevocable and payable at sight against presentation of shipping documents. L/C requirement maybe waived once stable business relation is established with other proper payment mechanism ensuring the seller to receive full payment before shipment is made.

Option#3 - 30% initial payment with the order and the balance to be covered by an L/C issued within 3 weeks from the date of the order. The L/C shall be irrevocable and payable at sight. To avoid expensive and time consuming L/C amendment, it is advised that, one week before the L/C is issued from the bank, the Buyer provide us with an L/C draft with all terms and conditions included for our review and pre-acceptance.
 

Gear Pumps are capable of moving small suspended solids but due to the meshing of gears they can be damaged by pumping large solids. When solids are present in the fluid they may act as abrasives, causing damage to the gears and increasing downtime. In terms of construction materials, gear pumps can be made from a wide variety of materials, ranging from alluminum, iron and stainless steel to cast iron, depending on the application and fluid properties (abrasive, corrosive etc.)


Marine, terminal unloading, chemical, petrochemical, food and general industrial, construction machinery, agricultural machinery, mobile industries,etc

Triple Pump

Triple Pump,Triple Gear Pump,Hydraulic Triple Gear Pump,John Deere Gear Pump

GRH , https://www.grhcn.net

This entry was posted in on